Last month, My goals were (not necessarily in the order listed):
• finish outline of "Revenge" === 75% DONE
• put some stitches into "Save the Stitches" blackwork === NOT done
• Design and prepare the base blocks for the Crazy Quilt/Bead Journal Project for October, November and December === DONE
• Complete the October block for the Crazy Quilt/Bead Journal Project === DONE
• Quilt three place mats for the quilt guild holiday project === NOT done (but I did load the bobbin!)
Also, while away at a papercrafting class, I put in some stitches into the border of my traveling needlepoint "Palm Tree Elegance". (I thought I had two night football games last month but I was wrong --- they are in the next three weeks...)
Considering I wasn't feeling that "stitchy" all month, this wasn't too bad.
Next month, my goals are:
- Finish the outline and start putting in the colors on "Revenge"
- Quilt those three place mats (or they will have to sit around my quilting space until NEXT holiday season!)
- Finish the November Crazy Quilt Journal/Bead Journal block